Campus Park

PROJECT: Swing Replacement

Description

Replacement of the toddler swing structure.

Status

Swing installation and site improvements tentatively scheduled for February 2020.  The swing area will be closed during construction.  Additional details will be posted as they become available.

Details

Swing Replacement Includes:

  • Replacement of the existing toddler swing with a similar unit.

  • Installation of new engineered wood fiber surfacing in swing area.

Please Note: For safety reasons, due to the limited size of the swing area, the existing toddler swing can only be replaced with another toddler swing.



Swing Structure

Contact

Chris Ball
Management Analyst
Email
(805) 517-6217

(Return to Projects Homepage)